##// END OF EJS Templates
Show hidden
Commit Message Age Author Refs
r25:26
- QR code added
0
r24:25
- After test of implemented options
0
r23:24
- ATS check also for calibration - 5. and 6. channels added for MLC - Numeration of the passed items added - Saving procedure changed
0
r22:23
- Assembly configuration: for MLC modified
0
r21:22
- Pictures added
0
r20:21
- Pictures deleted
0
r19:20
- Calibration illustrataion can be changed during the configuration
0
r18:19
- Calibration: video illustration added
0
r17:18
- WarmUp: aborting by DI32 is true or NA module temperature check; - Calibration pictures added
0
r16:17
- Maximized
0
r15:16
- Init before warm up; - No test and calibration possible, if init failed; - Messages in warm up page; - Calibration: visualisation added;
0
r14:15
- ReadMe added
0
r13:14
- Path on orion changed
0
r12:13
- Write error in Initialization.ini corrected
0
r11:12
- Calibration failed message after dialog windows close
0
r10:11
- PPL added to build folder
0
r9:10
- libraries are separated from the project (PPL is used)
0
r8:9
Reports folder can be remote. The nerwork analyzer will save the data locally and after that will copy them to network folder.
0
r7:8
Project name changed
0
r6:7
Project name changed
0
load next
< 1 2 >
showing 20 out of 27 commits